Customer Responsibilities
Before installing the system, the customer must perform or provide the following:
|
•
|
When required by NCR, provide the NCR Customer Services representative with appropriate drawings that indicate: |
|
•
|
Site wiring (power and communications, paths and lengths) |
|
•
|
Location of other equipment that may generate electrical noise, electromagnetic interference, or heat |
|
•
|
Make building alterations necessary to meet wiring and other site requirements |
|
•
|
Provide and install all communications cables, wall jacks, special connectors, and associated hardware |
|
•
|
Provide and install necessary power distribution boxes, conduits, grounds, lightning protection devices, and associated hardware |
|
•
|
Ensure all applicable codes, regulations, and laws (including, but not limited to, electrical, building, safety, and health) are met |
|
•
|
Provide and install auxiliary power or other equipment as required |
|
•
|
Provide storage or service areas as required |
|
•
|
Meet all system/unit environmental requirements |
|
•
|
Provide and install floor coverings and environment systems that limit or control static electricity build-up and discharge |
In general, keep the NCR equipment area free from dust, smoke, lint, and other particles. Restrict smoking, eating, and drinking around the equipment. Avoid locating the equipment near other machines that generate ink, carbon, and paper dust particles.